The following is the SSBC written submission to the Joint Review Panel regarding the proposed Enbridge Northern Gateway Project.
Aug. 25th Update:
We noticed some of the references in the letter are now invalid. Please note references #1 and #8 should point to http://ercb.ca/reports/r2007-
The following is the SSBC written submission to the Joint Review Panel regarding the proposed Enbridge Northern Gateway Project.
Aug. 25th Update:
We noticed some of the references in the letter are now invalid. Please note references #1 and #8 should point to http://ercb.ca/reports/r2007-