Steelhead in the News

Bonaparte River Habitat River Enhancement Project

—–COMPLETED—–

 

The Steelhead Society has been working on a habitat enhacement project on the Bonaparte River. This site is located approximately 24 km upstream from Cache Creek and 12 km downstream from Loon Lake, in a reach of the Bonaparte River with preferred steelhead habitat features. 

 

 

Below is the As-Built Summary and a full photo set from before and after (2012 vs 2013).

See here for the original project descripion.

 

—–COMPLETED—–

 

The Steelhead Society has been working on a habitat enhacement project on the Bonaparte River. This site is located approximately 24 km upstream from Cache Creek and 12 km downstream from Loon Lake, in a reach of the Bonaparte River with preferred steelhead habitat features. 

 

 

Below is the As-Built Summary and a full photo set from before and after (2012 vs 2013).

See here for the original project descripion.

 

Leave a Reply

Donate today and help wild steelhead and rivers in need.

Donate